Hello Tom
This is my first job they sent me on. It was in foster city at a residence home. I was very excited to be a part of this project. It was a 4.5 kW Roof mount PV System. The job included 22 "Evergreen 205" modules. We used Solar City's own Canopy mounting system, which i found alot easier and faster then the pro solar mounting system we used in our class. Also the inverter we used was a Fronious IG plus 3.8. It was a very exciting to work on the roof along side with the other installers. They really had me jump right into work rather than just have me stand and watch, which is what i expected since it was my first install. I did everything from cutting shingles and laying down the brackets, flashings, rails, and modules. They Even had me Carry up each module up the ladder and onto the roof which was really crazy. I had to position the module in one hand and carry it up a 10 foot ladder with gusts of wind almost blowing me over every other module. All and all the install was a success and we actually finished it all in one day.
Best Regards, Willie
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment